1. Documents Checks, Passport, CDC, TAR Book.(Particularly Record book and Tasks)
2. General talks on what kind of ships you have done, tonnage, power.
3. Taking over the watch….full round of the engine room.
4. What important documents will you find in the Control room.Why do we have the log book?
5. What will you do after finishing pumping out bilges?(Entry in Oil Record Book)
6. Who all can sign in the Oil Record Book?
7. How will you pump out OIL overboard?(cannot pump out oil)
8. Before starting up Boiler from Cold what documents are required to be checked?(ensure all work permits have been cancelled)
9. Procedure to flash up boiler from cold.What is water hammering?
10. Boiler Safeties.
11. What will you do if you find the boiler Safety valve leaking?
12. How will you come to know if there is a leak in the steam heating coil of Fuel oil Tank? (observation tank)
13. Main engine cold start.
14. If while blowing through you see oil coming out of one of the indicator cocks…what could be the reason?
15. Take generator onload.(Generator Already started)
16. If both generators are running in parallel and frequency of one generator is higher than the other......what will you do?
17. Generator Trips.
18. What type of fire extinguishers do you have onboard your ship?
19. What is DCP?
20. What is ISM?
21. What is COSWP?Safety Signs and symbols.
22. High main bearing temperature alarm of main engine,what will be your action?
23. Action in case of big fire in the engine room .
24. Prepare to receive bunkers.
25. Enclosed space entry all aspects.

Time taken - 30 mins Result- Pass.