
Student Name: RAJESH KUMAR
Course: EOOW
Surveyors Name: Mr.Peter Sara
MCA: Southampton, 15TH SEP 2008
1 TELLME ABOUT TAKING OVER WATCH.
2 TELL ME ABOUT YOUR SHIP.
3 TELL ME ABOUT CONTROL ROOM DOCUMENTS.
4 PURPOSE OF OIL RECORD BOOK.
5 ENTRY IN OIL RECORD BOOK.
6 TELL ME OILY WATER SEPERATOR OPERATION.
7 OILY WATER DISCHARGE WATER CAN YOU SEE OIL IN THAT.
8 ENGINE STARTING FROM COLD.
9 JACKET WATER TEMPERATURE.
10 PARALLELING OF GENERATOR.
11 HOW YOU WILL FIND EARTHFAULT.
12 HOW RECTIFY THE PROBLEM.
13 YOUR 440V PANEL HAVE EARTHFAULT WHAT YOU WILL DO.
14 ANY SWITCH YOU PUT ON BEFORE PRALLELING.
15 IF YOU SEE IN CONTROL ROOM NO VOLT IN VOLTMETER TELL ME THE REASON.
16 TELL ME HOW GENERATOR WORKS.
17 WHEN YOU WILL CLOSE BREAKER IN AFTER SYNCHRONISING WHAT WILL HAPPEN WITH INCOMING GENERATOR.
18 WHY SYNCHROSCOPE TURNS IN SLIGHTLY FAST DIRECTION.
19 TELL ME MAIN SWITCH BORD SAFETIES.
20 HOW MAGNETIC FIELD IS GENERATED IN GENERATOR.
21 WHEN YOU WILL CLOSE THE AIR VENT OF BOILER TELL ME PRESSURE.
22 BLOW DOWN GAUGE GLASS.
23 FLASHING UP BOILER AFTER MANTAINENCE.
24 HOW MANY GAUGE GLASSES IN BOILER.
25 HOW MANY MINUTES YOU WILL PURGE THE BOILER FOR FIRST STARTING.
26 GAUGE GLASS WATER LEVEL FOR FIRST STARTING LEVEL (IN CMS.)
27 WHY WE OPEN DRAIN VALVE OF STEAM LINE.
28 WHY INDICATOR COCK OPENED BEFORE STARTING
29 IF WATER COMING FROM INDICATOR COCK TELL ME REASON.
30 TELL ME IN CHAINBLOCK WHAT IS IMPORTANT THING.
31 BUNKER PROCEDURE.
32 TELL ME BUNKER CHECK LIST.
33 CODE OF SAFE WORKING PRACTICES.
34 HOW YOU WILL ADJUST FREQUENCY OF BOTH RUNING GENERATOR.
35 ENCLOSED SPACE ENTRY PROCEDURE.
36 MAIN ENGINE SAFETY AND INTERLOCK.
37 FIXED FIRE FIGHITING SYSTEM.
2 TELL ME ABOUT YOUR SHIP.
3 TELL ME ABOUT CONTROL ROOM DOCUMENTS.
4 PURPOSE OF OIL RECORD BOOK.
5 ENTRY IN OIL RECORD BOOK.
6 TELL ME OILY WATER SEPERATOR OPERATION.
7 OILY WATER DISCHARGE WATER CAN YOU SEE OIL IN THAT.
8 ENGINE STARTING FROM COLD.
9 JACKET WATER TEMPERATURE.
10 PARALLELING OF GENERATOR.
11 HOW YOU WILL FIND EARTHFAULT.
12 HOW RECTIFY THE PROBLEM.
13 YOUR 440V PANEL HAVE EARTHFAULT WHAT YOU WILL DO.
14 ANY SWITCH YOU PUT ON BEFORE PRALLELING.
15 IF YOU SEE IN CONTROL ROOM NO VOLT IN VOLTMETER TELL ME THE REASON.
16 TELL ME HOW GENERATOR WORKS.
17 WHEN YOU WILL CLOSE BREAKER IN AFTER SYNCHRONISING WHAT WILL HAPPEN WITH INCOMING GENERATOR.
18 WHY SYNCHROSCOPE TURNS IN SLIGHTLY FAST DIRECTION.
19 TELL ME MAIN SWITCH BORD SAFETIES.
20 HOW MAGNETIC FIELD IS GENERATED IN GENERATOR.
21 WHEN YOU WILL CLOSE THE AIR VENT OF BOILER TELL ME PRESSURE.
22 BLOW DOWN GAUGE GLASS.
23 FLASHING UP BOILER AFTER MANTAINENCE.
24 HOW MANY GAUGE GLASSES IN BOILER.
25 HOW MANY MINUTES YOU WILL PURGE THE BOILER FOR FIRST STARTING.
26 GAUGE GLASS WATER LEVEL FOR FIRST STARTING LEVEL (IN CMS.)
27 WHY WE OPEN DRAIN VALVE OF STEAM LINE.
28 WHY INDICATOR COCK OPENED BEFORE STARTING
29 IF WATER COMING FROM INDICATOR COCK TELL ME REASON.
30 TELL ME IN CHAINBLOCK WHAT IS IMPORTANT THING.
31 BUNKER PROCEDURE.
32 TELL ME BUNKER CHECK LIST.
33 CODE OF SAFE WORKING PRACTICES.
34 HOW YOU WILL ADJUST FREQUENCY OF BOTH RUNING GENERATOR.
35 ENCLOSED SPACE ENTRY PROCEDURE.
36 MAIN ENGINE SAFETY AND INTERLOCK.
37 FIXED FIRE FIGHITING SYSTEM.
Duration: 1 Hour Result: Pass

.jpg)